Call Center Implementation

Installation of 165 cat 6 LAN points to all the user from main data rack located in first floor and providing 24 cores of fibre uplink from datacentre located in 5th floor, Supply and installation of 2 no’s 800*1000 net beats cabinets, Replacement and installation 5 no’s 48 port network switches , Providing Raised flooring approximately 50sqmtrs